3 Point Forward
Evidence

Projects you can open.

Every project here has a destination you can open. Each write-up says what was delivered, what it connects to, what came off a verification run, and what has not been proved.

These were built by SOPHIA XT, our engineering arm. Each page names which side did what.

One company, two jobs

SOPHIA XT is the engineering arm of 3 Point Forward.

3 Point Forward

3 Point Forward does the business work: diagnosing what is actually wrong with an operation, planning the implementation, applied-AI consulting, training the staff who will run it, and managing the engagement.

Start with the assessment

SOPHIA XT — the engineering arm

SOPHIA XT does the engineering: custom business software, integrations, AI engineering, developer tooling and the research underneath it.

sophiaxt.com

One company, two jobs. 3 Point Forward defines the operational problem and the implementation plan; SOPHIA XT builds what the plan needs. A company that already knows what it wants built can go straight to SOPHIA XT, and a company that needs the problem defined first should start at 3 Point Forward. Either door reaches the same team.

Next step

Work out which of these your operation needs.

The assessment takes about three minutes and gives you a written read before you speak to anybody.

Business systems assessment Book a consultation